THIS INVOLVES UNILATERAL ORDER THAT WILL REQUIRE RECIPIENT(S) TO DESIGN AND IMPLEMENT THE SELECTED REMEDY FOR THIS OPERABLE UNIT OF THE SITE. EXCAVATION OR COVER OF CONTAMINATED SOIL WITH EXCAVATED SOIL TO BE DISPOSED IN LANDFILL CONSTRUCTED FOR OV1 AND 4 WASTE.