# IROQUOIS FOUNDRY
> **Administrative - Formal** · FY1998 · — · Final Order With Penalty
## Case
- **Activity ID:** `31076`
- **Case Number:** 05-1998-0482
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $57K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- IROQUOIS FOUNDRY (complaint) (settlement)
## Summary

ADMINISTRATIVE PENALTY ORDER FOR VIOLATIONS OF WIS. SIP      VISABLE EMISSIONS, AND OPACITY LIMITATIONS.                  IROQUOIS FOUNDRY PRODUCES GREY IRON CASTINGS FROM SCRAP      METAL.  EMISSION SOURCES AT THE PLANT INCLUDE A CUPOLA FURNA CE WHICH WAS INSTALLED IN 1997, DOCUMENTED VIOLATIONS OF     OPACITY AND CARBON MONOXIDE (CO) REGULATIONS AT THE CUPOLA.  STACK TESTS EXCEEDANCES OF THE PM LIMITS CONTAINED IN THE    WISCONSIN SIP.  TO COMPLY WITH THE CO AND THE PM LIMITS,     IROQUOIS FOUNDRY INSTALLED AN AFTER BURNER FOR THE CUPOLA    AND UPGRADED THE VENTURI SCRUBBER SYSTEM.  THIS CASE WAS     RESOLVED BY ISSUING A CACO AND A 113(A) ORDER.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*