# CRITERION CATALYSTS COMPANY L.P.
> **Administrative - Formal** · FY1998 · — · Final Order With Penalty
## Case
- **Activity ID:** `31077`
- **Case Number:** 05-1998-0483
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $4K
- **Cost recovery:** —
- **Compliance action $:** $0
- **Multimedia (multi-env):** N
## Defendants
- CRITERION CATALYSTS COMPANY L.P (complaint) (settlement)
## Summary

VIOLATIONS OF SDWA UIC REQUIREMENTS AT SECTION 1423 RELATED  TO:                                                            1).  FACILITY EXCEEDED THE MAXIMUM PERMITTED INJECTION            PRESSURE                                                2).  FACILITY FAILED TO MANINTAIN SUFFICIENT PRESSURE             DIFFERENTIAL BETWEEN THE ANNULUS AND THE INJECTION           TUBING.  THESE VIOLATIONS CAN BE CONSIDERED  PERMIT          VIOLATIONS.                                                  UNDER 40 CFR 144.51                                   VIOLATIONS OF UIC PERMIT                                     COUNT I:  FAILURE TO MAINTAIN ANNULUS/TUBING DIFFERENTIAL.   COUNT II:  FAILURE TO MONITOR INJECTION PRESSURE DURING A    WELL SHUT-IN.                                                COUNT III:  FAILURE TO INJEST AT PRESSURES BELOW THE         LIMITATIONS SET FORTH IN THE PERMIT.                         COUNT IV:  FAILURE TO SUBMIT ACCURATE REPORTS.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*