# DIXIE AUTO SALVAGE SITE
> **Administrative - Formal** · FY1998 · — · Final Order No Penalty
## Case
- **Activity ID:** `31310`
- **Case Number:** 05-1998-0742
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $3.50M
- **Multimedia (multi-env):** N
## Defendants
- DIXIE AUTO SALVAGE SITE (settlement)
- GENERAL ELECTRIC COMPANY (settlement)
## Summary

THIS IS THE SECOND AND FINAL CONSENT ORDER ENTERED WITH GE   FOR THE SITE.  THIS CONSENT ORDER WILL RESULT IN THE         EXCAVATION AND CONSOLIDATION ON-SITE OF PCB CONTAMINATED     SOILS AND SEDIMENTS AND LEAD CONTAMINATED SOILS.  THE        ON-SITE DISPOSAL LOCATION WILL MEET ALL APPLICABLE AND       RELEVANT AND APPROPRIATE REQUIREMENTS INCLUDING TSCA         DISPOSAL REQUIREMENTS.  AN ORPHAN SHARE ALLOCATION WAS       PROVIDED TO GE IN THE AMOUNT OF $900,000 OR APPROXIMATELY    25%.  GE ALSO AGREED NOT TO PURSUE DE MINIMIS PARTIES AT     THE SITE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*