← EPA enforcement cases

USL-CITY ENVIRONMENTAL

Administrative - Formal · FY2000 · — · Final Order With Penalty · 32566

$155K
Penalty
Cost recovery
$3K
Compliance action

Case

Case Number
05-2000-0565
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

IN SEPTEMBER 1977, RESPONDENT BEGAN OPERATION OF A NEW WASTE STABILIZATION FACILITY UNDER INTERIM STATUS, AND INSTALLED A CARBON SYSTEM AS A CONTROL DEVICE. THE REGULATIONS REQUIRED AN ENCLOSED COMBUSTION DEVICE. NO BASIS OF DESIGN (RECORD) WAS MAINTAINED FOR THE CONTROL DEVICE. UPON TESTING THE DEVICE AND FINDING IT DID NOT MEET THE REGULATORY PERFORMANCE REQUIREMENT (95% CONTROL), THE FACILITY BEGAN IN JUNE 1998 TO TREAT THE WASTE IN CON- TAINERS. EMISSIONS WERE GENERATED DURING TREATMENT WHICH WERE NOT CONTROLLED FOR A PERIOD OF TIME, THEN ROUTED TO THE EXISTING UTILITY BOILER. THE BOILER WAS SHOWN NOT TO MEET THE MINUMUM TEMPERATURE REQUIREMENT AT ALL TIMES WHEN WASTE WAS BEING TREATED.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown