# ARMEL BYRNES
> **Administrative - Formal** · FY2001 · — · Final Order With Penalty
## Case
- **Activity ID:** `32932`
- **Case Number:** 05-2001-0284
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $450
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- ARMEL BYRNES (complaint) (settlement)
## Summary

THE FACILITY IS OWNED BY ARMEL BYRNES.  ARMEL BYRNES MANU-   FACTURES CEMENT AT THIS FACILITY.  THERE ARE CURRENTLY TWO   12,000 GALLON AND TWO 6,000 GALLON FIBERGLASS UNDERGROUND    STORAGE TANKS (UST) HOUSING DIESEL AND GASOLINE LOCATED AT   THE FACILITY.  THE FACILITY IS LOCATED IN A RURAL INDUSTRIAL AREA OF MIDDLETOWN, OH.                                      THE FACILITY DID NOT PERFORM ADEQUATE LEAK DETECTION ON      THEIR UST SYSTEM.  AS A RESULT A FIELD CITATION WAS ISSUED   IN THE AMOUNT OF $450.00.                                    1.  40 CFR 280.41(A) - FAILURE TO MONITOR TANKS AT LEAST         EVERT 30 DAYS. - $300.00                                 2.  40 CFR 280.45(A) - FAILURE TO MAINTAIN RECORDS OF RE-        LEASE DETECTION MONITORING. - $150.00

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*