THIS ORDER PROVIDES FOR PERFORMANCE OF REMOVAL ACTIONS AND REIMBURSEMENT OF RESPONSE COSTS. RESPONDENT SHALL PERFORM THE FOLLOWING REMOVAL ACTIONS: LOCATE ALL ASTS AND USTS ON THE SITE, AND CHARACTERIZE THEIR CONTENTS; PREPARE AND IMPLEMENT A SAMPLING PLAN FOR ALL TANKS AND Q SITE HEALTH AND SAFETY PLAN; REMOVE AND DISPOSE OF ALL OF THE CONTENTS OF THE TANKS AND THE CONTAMINATED SOILS SURROUNDING THE TANKS. RESPONDENT SHALL PAY ALL OVERSIGHT COSTS. RESPONDENT FAILS TO FULLY PERFORM ANY REQUIREMENT OF THIS ORDER IN ACCORDANCE WITH THE SCHEDULE, RESPONDENT SHALL BE LIABLE AS PENALTIES.