EN-CHRO PLATING WAS INSPECTED ON 3/14/2001. DURING THE INSPECTION, THE FOLLOWING CONDITIONS WERE OBSERVED AND PHOTO GRAPHED: FACILITY PERSONNEL WERE NOT PROVIDED THE REQUIRED TRAINING. A HAZARDOUS WASTE CONTAINER WAS FOUND UNMARKED/ UNLABELED. HAZARDOUS WASTE STORAGE TANK SYSTEM HAS SEVERAL DEFICIENCIES, INCLUDING NO INSPECTION RECORDS, NO WRITTEN ASSESSMENT BY A PROFESSIONAL ENGINEER, AND INADEQUATE SECONDARY CONTAINMENT FLOOR. IN ADDITION, FAILURE TO MINIMIZE THE POTENTIAL FOR HAZARDOUS WASTE RELEASES AS EVIDENCED BY SUBSTAINTIAL HAZARDOUS CONSTITUENT ACCUMULA- TIONS AND CORROSION ON FACILITY FLOOR. KAREN PEACEMAN IS CURRENTLY ON A DETAIL IN MY SECTION (WPTD/ECAD/CS-1). SHE HAS BEEN INVOLVED IN THIS CASE FROM THE START AND HAS REQUESTED TO CONTINUE WITH THIS ENFORCEMENT ACTION. PLEASE ASSIGN KAREN PEACEMAN AS THE ATTORNEY ON THIS CASE. THANK YOU.