# POLO POINT LLC
> **Administrative - Formal** · FY2001 · — · Final Order No Penalty
## Case
- **Activity ID:** `33156`
- **Case Number:** 05-2001-0524
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $0
- **Multimedia (multi-env):** N
## Defendants
- POLO POINT LLC (settlement)
## Summary

PERMITTEE DID NOT FOLLOW PROCEDURE IN PERMIT FOR TRANSFER OF OWNERSHIP OR CONTROL; POLO POINT DID NOT APPLY FOR A PERMIT  FOR DISCHARGE OF STORM WATER ASSOCIATED WITH CONSTRUCTION;   A SEDIMENT DISCHARGE FROM POLO POINT SUBDIVISION MIXING WITH TROUT CREEK WAS OBSERVED; INSTALLATION OF SILT FENCES AND    EROSION CONTROL MEASURES WERE INADEQUATE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*