← EPA enforcement cases

ELSA SKINNER, ET AL

Judicial · FY2001 · — · — · 33229

Penalty
$34K
Cost recovery
Compliance action

Case

Case Number
05-2001-0603
Type
Judicial
Lead
EPA
Outcome
Multimedia
N
Self-disclosure
N

Defendants (18)

Summary

FY 2015: Amended Stipulation Order - Amending the requirements of Paragraph 13(c) of the CD entered on 4/3/2001. Paragraph 13(c) required the construction of an upgradient groundwater control system if the EPA determined that there would be prolonged contact between groundwater and waste material at the site. Although monitoring established that such contact existed, EPA has determined that the contact has not caused significant groundwater contamination. In the Stipulation and Proposed Order, the Parties seek to amend Paragraph 13(c) by striking the requirement for upgradient groundwater control. In the event that future monitoring identifies significant groundwater contamination, the amended Paragraph 13(c) requires the Settling Generator/Transporter Defendants to submit a plan to address the problem. THIS CDS IS FOR SKINNER #2 OR THE MSW CONSENT DECREE. A SEPARATE CONSENT DECREE (SKINNER #1 OR THE RA CD) WAS ENTER- ED BY THE COURT ON THE SAME DAY. SHERRY ESTES IS THE ASSIGN ED ATTORNEY FOR THE RA CD

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown