# ALCHEM ALUMINUM, INC.
> **Administrative - Formal** · FY2001 · — · Final Order No Penalty
## Case
- **Activity ID:** `33242`
- **Case Number:** 05-2001-0617
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- ALCHEM ALUMINUM, INC. (settlement)
## Summary

ALCHEM ALUMINUM FAILED TO CONDUCT STACK TESTING FOR DIOXIN   WITHIN 180 DAYS OF STARTUP OF ITS SMELTING FURNACE, AS       REQUIRED BY THE SECONDARY ALUMINUM NESHAP.  THE FURNACE WAS  TAKEN DOWN FOR REPAIRS, AND WILL BE TESTED WITHIN 30 DAYS    OF RE-STARTING.

---