← EPA enforcement cases

CINCH CONNECTORS, INC.

Administrative - Formal · FY2002 · — · Final Order With Penalty · 33450

Penalty
Cost recovery
Compliance action

Case

Case Number
05-2002-0101
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
N
Self-disclosure
N

Defendants (2)

Summary

Administrative complaint issued to company for failure to maintain appropriate records. The facility at which the violations occurred shut down after the U.S. EPA inspection. However, the corporation is still in existence and is receiving a complaint for failure to make hazardous waste determinations, failure to prepare hazardous waste manifests, failure to keep hazardous waste determination records, and failure to conduct weekly container safety inspections. In addition, the lead pollutant reduced in the mineral spirits waste stream that was misidentified as non-hazardous waste and shipped off-site is no longer being generated. Cinch generated approx. 3,545 gallons/year. The amount of lead was analyzed at 14 mg/L. The total lead amount was then determined to be 200 grams of reduction/elimination per year. Respondent has paid amount required under CAF

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown