# CEMATCO, INCORPORATED
> **Administrative - Formal** · FY1984 · — · Unknown
## Case
- **Activity ID:** `33852`
- **Case Number:** 06-1984-0068
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unknown
- **Penalty assessed:** $8K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CEMATCO, INCORPORATED (complaint) (settlement)
## Summary

BACKGROUND INFO.                                             CEMATCO, INC., LOCATED AT 9705 BURNET RD, SUITE 201, AUSTIN, TX, NOTIFIED AS GENERATOR AND TRANSPORTER.  CEMATCO, INC.    LEASES PROPERTY FROM KDM (PRIMARY TSD FACILITY) AT 4307      PROFIT DRIVE, SAN ANTONIO, TX.  CEMATCO WAS HIRED BY BASLER  AS A TRANSPORTER AND CONSULTANT TO SHIP METHYLENE CHLORIDE   FROM A VAPOR DEGREASER TO KDM FOR RECYCLING.  KDM REJECTED   THE WATE BECAUSE IT WAS TOO CONTAMINATED WITH HEAVY METALS.  CEMATCO SOLIDIFIED WASTE AT ITS FACILITY IN SAN ANTONIO,     THEN TRANSPORTED THE WASTE TO TEXAS ECOLOGISTS (TECO) THE    ALTERNATE TSD FACILITY.  THE PROBLEM IS THAT CEMATCO IS NOT  AUTHORIZED TO TREAT HAZ WASTE AND CEMATCO USED BASLER AS     GENERATING FACILITY ON MANIFEST AND SIGNED MANIFEST FOR      BASLER.  THE ABOVE INFO WAS DISCOVERED DURING THE INSPEC-    TION OF BASLER ELECTRIC CIRCUITS, INC.  CEMATCO IS NOT       ELIGIBLE FOR INTERIM STATUS BECAUSE THE SAN ANTONIO FACILITY WAS NOT IN EXISTENCE ON NOV 19, 1980.                        *                                                            RECOMMENDATION:                                              ISSUE A COMPLAINCE ORDER FOR NO NOTIFICATION, NO FINAL RCRA  PERMIT AND IMPROPER USE OF MANIFESTS.  TOTAL PENALTY IS      $7,500.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*