Alleged violations: (1) Failure to develop a stormwater management plan, (2) Failure to conduct required self-inspections from the start of the construction project on approximately October 8, 2012 until the date of the EPA's inspection? on December 5,2012 and (3) Failure to implement stormwater controls to minimize discharges of sediment and other pollutants into waters of the United States.