## Summary

The Environmental Protection Agency (EPA) received a tip/complaint alleging the Respondent was renovating the interior of a pre-1978 apartment building, at 36 Gramercy Park East, New York, NY 10003, without following the lead-safe work practices mandated by the Renovation, Repair & Painting Rule.  An on-site inspection was conducted on January 4th, 2011.  Alleged violations were identified by EPA and outlined in the ÂOpportunity to Show Cause for ViolationsÂ  letter (SCL) which was first issued to the Respondent on on March 28, 2012. The President of the company claimed he never received the first SCL, therefore a second SCL was issued on May 30, 2012.  After the second SCL was received, informal settlement conferences were held between EPA and the Respondent.  A reduced penalty was sought based on a demonstrated inability to pay the initial proposed penalty.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*