A stormwater inspection was conducted at this site, classified as a bakery, by the New Mexico Environment Department on November 28, 2012. It was determined that the site was unpermitted under the Stormwater Multi-Sector General Permit (MSGP). An administrative order was issued on May 28, 2013, to address this violation.