# FREMONT RE-3 SCHOOL DISTRICT
> **Administrative - Formal** · FY2013 · — · Final Order With Penalty
## Case
- **Activity ID:** `3400123328`
- **Case Number:** 08-2013-0057
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- FREMONT RE-3 SCHOOL DISTRICT (complaint) (settlement)
## Summary

ON AUGUST 8, 2012, AUTHORIZED EPA EMPLOYEES ENTERED THE FACILITY, WITH CONSENT, TO INSPECT IT FOR COMPLIANCE WITH LAW.  THIS INSPECTION SHOWED THAT THE FACILITY OPERATES A MOTOR MAINTENANCE AREA (BUS BARN) WITH ONE LONG FLOOR DRAIN RUNNING EAST/WEST THROUGH THE CENTER OF THE STRUCTURE.  THE FLOOR DRAIN IS CONNECTED TO A SEPARATE 1000-GALLON TANK WITH ITS OWN DRAIN FIELD. Facility permanently closed the well within the timeframe of the order and so no penalty was collected.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*