EJ Gallo Livingston CA CAA 112r7 RMP ESA

Administrative - Formal · FY2013 · — · Final Order With Penalty · 3400142559

Penalty
Cost recovery
Compliance action

Case

Case Number
09-2013-3507
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

This is an Expedited Settlement Agreement reached with Respondent EJ Gallo Winery - Livingston for violations of the RMP requirements of CAA §112(r)(7) and 40 CFR Part 68. During an inspection of the facility on 9 August 2012 it was determined that the facility failed to: 1) Document that equipment complies with recognized and generally accepted good engineering practices as required by Section 112(r)(7) of the Act, and 40 C.F,R. §68.65(d)(2); 2) Develop and implement written operating procedures that provide clear instructions for safely conducting activities in each covered process consistent with the safety information and shall address at least the following elements... steps for each operating phase, including temporary operations, as required by Section 112(r)(7) of the Act, and 40 C.F.R. §68.69(a)(1)(iii); 3) Develop and implement written operating procedures that provide clear instructions for safely conducting activities in each covered process consistent with the safety information and shall address at least the following elements... Safety and health considerations, such as precautions necessary to prevent exposure including engineering controls, and personal protective equipment, as required by Section 1 12(r)(7) of the Act, and 40 C.F.R. §68.69(a) (3) (ii); 4) Certify annually that the operating procedures are current and accurate and that procedures have been reviewed as often as necessary as required by Section 1 12(r)(7) of the Act, and 40 C

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown