← EPA enforcement cases

JARVIS DRILLING

Administrative - Formal · FY2013 · — · Final Order With Penalty · 3400158472

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2013-7008
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

9/18/2013 - EXPEDITED SPCC SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $3,125. RESPONDENT SHALL MAKE PAYMENT WITHIN THIRTY DAYS. AGREEMENT ALLEGES: PLAN NOT CERTIFIED BY A PROFESSIONAL ENGINEER PLAN DOES NOT FOLLOW SEQUENCE OF THE RULE AND/OR CROSS-REFERENCE NOT PROVIDED INADEQUATE OR NOT DESCRIPTION OF DRAINAGE CONTROLS PLAN DOES NOT DISCUSS AND FACILITY DOES NOT IMPLEMENT APPROPRIATE CONTAINMENT/DIVERSIONARY STRUCTURES/EQUPMENT-(INCLUDING TRUCK TRANSFER AREAS) NO INSPECTION RECORDS WERE AVAILABLE FOR REVIEW NO TRAINING ON THE OEPRATION AND MAINTENANCE OF EQUIPMENT TO PREVENT DISCHARGES NO TRAINING ON THE APPLICABLE POLLUTION CONTROL LAWS, RULES, AND REGULATIONS SPILL PREVENTION BRIEFINGS ARE NOT SCHEDULED AND CONDUCTED PERIODICALLY FIELD DRAINING SYSTEM (DRAINAGE DITCHES AND ROAD DITCHES), OIL TRAPS, SUMPS AND/OR SKIMMERS ARE NOT REGULARLY INSPECTED AND/OR OIL IS NOT PROMPTLY REMOVED. VISUAL INSPECTIONS OF CONTAINERS, FOUNDATION AND SUPPORTS ARE NOT CONDUCTED PERIODICALLY FOR DETERIORATION AND MAINTENANCE NEEDS. ABOVE GROUND VALVES AND PIPELINES ARE NOT EXAMINED PERIODICALLY ON A SCHEDULED BASIS FOR GENERAL CONDITION INADEQUATE OR NO FLOWLINE MAINTENANCE PROGRAM (INCLUDES; EXAMINATION, CORROSION PROTECTION, FLOWLINE REPLACMENT.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown