# UNITED STATES POSTAL SERVICE (USPS-PRINCE WILLIAMS BRANCH)
> **Administrative - Formal** · FY2013 · — · Final Order With Penalty
## Case
- **Activity ID:** `3400160643`
- **Case Number:** 03-2013-0171
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- UNITED STATES POSTAL SERVICE (USPS-PRINCE WILLIAMS (complaint) (settlement)
## Summary

FAILURE TO PROVIDE TANK RELEASE DETECTION AS REQUIRED BY 9 VAC25-580-160.
FAILURE TO PERFORM LINE TIGHTNESS TESTING OR MONTHLY MONITORING ON PIPING AS REQUIRED BY 9 VAC 25-580-180.
FAILURE TO PERFORM AUTOMATIC LINE LEAK DETECTOR TESTING ANNUALLY AS REQUIRED BY VAC-25-580-170
FAILURE TO REPORT AND INVESTIGATE A SUSPECTED RELEASE AS REQUIRED BY VAC-25-580-190 & 200.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*