# Dow Chemical Bldg. 1790 (Midland) CAFO
> **Administrative - Formal** · FY2014 · — · Final Order With Penalty
## Case
- **Activity ID:** `3400184244`
- **Case Number:** 05-2014-7236
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Dow Chemical Company (Midland, MI) (complaint) (settlement)
## Summary

This enforcement action was filed in response to violations of CAA 112(r)(7) which were discovered during a Risk Management Plan (RMP) compliance inspection conducted on 6/15 - 6/18/2009.  These violations include: 1.)  failure to implement written procedures to maintain the ongoing integrity of the process equipment;  2.) failure to ensure the frequency of inspections and tests of the process equipment consistent with manufacturer's recommendations and good engineering practices;  3.)  failure to implement written procedures to manage changes to equipment;  4.)  failure to obtain and evaluate adequate information regarding a contractor's safety performance and programs prior to hiring them.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*