# ATLANTIC PETROLEUM, INC.
> **Administrative - Formal** · FY2013 · — · Final Order With Penalty
## Case
- **Activity ID:** `3400222570`
- **Case Number:** 04-2013-7006
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- ATLANTIC PETROLEUM (complaint) (settlement)
## Summary

2/20/14 - EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $4,500. VIOLATIONS:  NO EVIDENCE OF 5-YEAR REVIEW OF PLAN BY OWNER/OPERATOR ($75.00); PLAN DOES NOT FOLLOW SEQUENCE OF THE RULE AND/OR CROSS-REFERENCE NOT PROVIDED ($150.00); PLAN DOES NOT DISCUSS AND FACILITY DOES NOT IMPLEMENT APPROPRIATE CONTAINMENT/DIVERSIONARY STRUCTURES/EQUIPMENT ($400); PLAN DOES NOT INCLUDE INSPECTIONS AND TEST PROCEDURES IN ACCORDANCE WITH 40 CFR PART 112 ($75); NO TRAINING ON THE OPERATION AND MAINTENANCE OF EQUIPMENT TO PREVENT DISCHARGES AND OR FACILITY OPERATIONS ($75); NO TRAINING ON DISCHARGES PROCEDURE PROTOCOLS ($75); NO TRAINING ON THE APPLICABLE POLLUTION CONTROL LAW, RULES, AND REGS AND/OR SPCC PLAN ($75); SPILL PREVENTION BRIEFINGS ARE NOT SCHEDULED AND CONDUCTED AT LEAST ANNUALLY ($75); PLAN HAS INADEQUATE OR NO DISCUSSION OF PERSONNEL AND SPILL PREVENTION AND SPILL PREVENTION PROCEDURES ($75); PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY SECURITY ($75); INADEQUATE SECONDARY CONTAINMENT, AND/OR RACK DRAINAGE DOES NOT FLOW TO CATCHMENT BASIN, TREATMENT SYSTEM, OR QUICK DRAINAGE SYSTEM ($750); PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY TANK CAR AND TANK TRUCK LOADING/UNLOADING RACK ($75); ADEQUATE RECORDS (OR NPDES PERMIT RECORDS) OR DRAINAGE FROM DIKED AREAS NOT MAINTAINED ($75); PLAN HAS INADEQUATE OR NO DISCUSSION OF FACILITY DRAINAGE ($75); CONTAINMENT SYSTEMS, INCLUDING WALLS AND FLOORS ARE NOT SUFFICIENTLY IMPERVIOUS TO CONTAIN OIL ($375); ABOVEGROUND T

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*