THE ORDER REQUIRES THE FACILITY INSTALL A CATALYTIC CONVERTER ON ITS CYDE CRANE ENGINE BY MAY 3, 2014, THEN REDO A PERFORMANCE TEST IN ACCORDANCE WITH SUBPART ZZZZ WITHIN 30 DAYS OF INSTALLATION OF THE CONTROL, IN ORDER TO MEET THE CO EMISSIONS LIMITS IN THE RULE. IF THE ENGINE CANNOT MEET THE RULE LIMITS, KINDER MORGAN MUST EITHER INSTALL A NEW INTERNAL COMBUSTION ENGINE OR USE AN ELECTRIC MOTOR TO RUN THE CRANE.