# Crop Production Services (St. Johns) ESA
> **Administrative - Formal** · FY2014 · — · Final Order With Penalty
## Case
- **Activity ID:** `3400237747`
- **Case Number:** 05-2014-7258
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Crop Production Services (Flushing MI) (complaint) (settlement)
## Summary

This enforcement action was filed in response to violations discovered during a CAA 112(r)(7) Risk Management Plan inspection conducted on July 22, 2013. Violations included: 1) failure to conduct a hazard review when a major change in process occurs; 2) failure to ensure that each employee was trained on the processes and procedures that pertain to their duties; 3) failure to implement procedures to maintain the ongoing mechanical integrity of raincaps; 4)  failure to perform inspections and tests of emergency safety valves at a frequency consistent with applicable manufacturers' recommendations,  industry standards, or good engineering practices; 5) failure to certify every three years that procedures and practices developed under the rule are adequate and being followed; and 6) failure to revise and update their Risk Management Plan within 6 months of a change that requires a revised PHA or hazard review.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*