# ALLEN BLUEBERRY FARMS, INC.
> **Administrative - Formal** · FY2014 · — · Final Order No Penalty
## Case
- **Activity ID:** `3400245607`
- **Case Number:** 04-2014-5760
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- ALLEN BLUEBERRY FARMS, INC. (SB) (settlement)
## Summary

5/28/14 - ADMINISTRATIVE COMPLIANCE ORDER ON CONSENT ISSUED. THIS AOC PERTAINS TO THE DEPOSITION OF DREDGED AND/OR FILL MATERIAL INTO JURISDICTIONAL WETLANDS AND WATERS OF THE U.S., INCLUDING APPROX 4.5 ACRES OF WETLANDS IN ALMA, GA. THE DEPOSITION OF DREDGED AND/OR FILL MATERIAL OCCURRED DURING ACTIVITIES ASSOCIATED WITH THE CLEARING AND FILLING OF WETLANDS FOR THE ESTABLISHMENT OF BLUEBERRY PRODUCTION.  COMMENCING ON OR ABOUT JULY 2007 TO THE PRESENT, RESPONDENT AND/OR THOSE ACTING ON BEHALF OF THE RESPONDENT DISCHARGED DREDGED AND/OR FILL MATERIAL INTO WETLANDS ON THE SITE USING EARTH MOVING MACHINERY DURING UNAUTHORIZED ACTIVITIES ASSOCIATED WITH THE CONVERSION OF FORESTED WETLANDS TO BLUEBERRY PRODUCTION. TO DATE, THE UNAUTHORIZED DREDGED AND/OR FILL MATERIAL REMAINS IN WATERS OF THE U.S.  RESPONDENT'S UNAUTHORIZED ACTIVITIES IMPACTED APPROX 4.5 ACRES OF WETLANDS THAT ARE ADJACENT TO AN UNNAMED TRIBUTARY OF TENMILE CREEK, WHICH FLOWS THRU A SECOND UNNAMED TRIBUTARY TO TENMILE CREEK, THEN THRU TENMILE CREEK, AND HURRICANE CREEK, BEFORE JOINING THE ALABAHA RIVER, A NAVIGABLE-IN-FACT WATER OF THE U.S. AT NO TIME DURING THE DISCHRAGE OF DREDGED AND/OR FILL MATERIAL INTO THE DISCHARGE AREA FROM JULY 2007 TO THE PRESENT DID RESPONDENT POSSESS A PERMIT UNDER CWA 404 AUTHORIZING THE DISCHARGE OF DREDGED AND/OR FILL MATERIAL BY RESPONDENT.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*