# BASIN REFINING
> **Administrative - Formal** · FY1988 · — · Final Order No Penalty
## Case
- **Activity ID:** `34543`
- **Case Number:** 06-1988-0517
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BASIN REFINING (complaint)
## Summary

FACT SHEET:                                                  *                                                            BASIN REFINING IS A FACILITY LOCATED IN OKMULGEE, OK,        HISTORICALLY ENGAGED IN THE BUSINESS OF REFINING CRUDE PETRO LEUM.  REFINING HAS BEE CONDUCTED AT THE SITE SINCE ON OR    BEFORE NOV 18, 1980.  HOWEVER, IN LATE 1983, MOST REFINERY   OPERATIONS AT THE SITE WERE SUSPENDED.  IN 1983, BASIN REFIN ERY OPERATIONS AT THE SITE WERE SUSPENDED.  IN 1983, BASIN   REFINERY ENTERED INTO THE PROTECTION OF THE BANKRUPTCY COURT FOR A CHAPTER 11 REORGANIZATION.  THE TRUSTEE FOR THE BANK-  RUPTCY HAS APPARENTLY PROPOSED A PLAN FOR LIQUIDATION OF THE ASSETS.                                                      *                                                            NO NOV 8, 1985, BASIN LOST INTERIM STATUS WHEN IT FAILED     TO CERTIFY COMPLIANCE WITH APPLICABLE GWM AND FINANCIAL      ASSURANCE REQUIREMENTS AND SUBMIT A PART B PERMIT APPLICA-   TION.  BASIN SUBSEQUENTLY FAILED TO SUBMIT A CLOSURE PLAN    BY NOV 23, 1985, AND HAS NOT SUBMITTED A CLOSURE PLAN TO     DATE.                                                        *                                                            ON DECEMBER 3-8, 1985, A CASE DEVELOPMENT AND SAMPLING       INSPECTION WAS CONDUCTED AT THE FACILITY BY EPA AND RCRA     CONTRACTORS.  NUMEROUS SAMPLES WERE CONDUCTED TO DETERMINE   WHETHER THERE HAD BEEN RELEASES FROM HAZ OR SOLID WASTE      MANAGEMENT UNITS.  ACCORDING TO FACI

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*