# GNB, INC.
> **Judicial** · FY1989 · — · Final Order With Penalty
## Case
- **Activity ID:** `34663`
- **Case Number:** 06-1989-0113
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $330K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- GNB, INC. (complaint) (settlement)
## Summary

GNB, INC. OWNS & OPERATES SECONDARY LEAD RECOVERY FACILITY LOCATED IN FRISCO, TX.  BY NO LATER THAN MARCH 8, 1987, SAID  FACILITY WAS REQUIRED TO COMPLY WITH U.S. EPA PRETREATMENT  STANDARDS APPLICABLE TO INDUSTRIES WITHIN THE NOFERROUS META L MANUFACTURING POINT SOURCE CATEGORY.                         JULY 87 THRU DECEMBER 88 GNB INC VIOLATED ON MONTHLY BASIS SECTIONS 301 AND 307 OF THE CWA IN THAT GNB FAILED TO MEET   APPLICABLE EPA PRETREATMENT STANDARD FOR A NTIMONY, ARSENIC  LEAD AND ZINC.  BNB INC. ADDITIONALLY VIOLATED SECT. 301 BY   FAILING TO TIMELY SUBMIT TO EPA COMPLIANCE REPORTS REQUIRED  BY THE PRETREATMENT REGULATIONS LOCATED AT 40 CFR & 403.12.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*