← EPA enforcement cases

LAFARGE, INCORPORATED

Judicial · FY1991 · — · Final Order With Penalty · 35194

$11K
Penalty
Cost recovery
Compliance action

Case

Case Number
06-1991-0005
Type
Judicial
Lead
EPA
Outcome
Final Order With Penalty
DOJ Docket
90-5-2-1-1865
Multimedia
N
Self-disclosure
N

Defendants (3)

Summary

01/02/90 SYNOPSIS OF CASE: LAFARGE, INCORPORATED (HEREIN- AFTER LAFARGE ), IS A CEMENT MANUFACTURING COMPANY ALSO IN -VOLVED IN THE PRODUCTION AND SALE OF CEMENT, READY MIX CONCRETE, AND OTHER CONCRETE PRODUCTS. LAFARGE, A SUBSIDIAR Y OF LAFARGE COPPEE SA, PARIS FRANCE, IS BASED IN RESTON, VA AND HAS B RANCH OFFICES AND DIVISIONS THROUGHOUT THE UNITED STATES AND CANADA. LAFARGE HAS A DIVISION OFFICE IN FT. WORTH, TX, (HEREINAFTER THE FACILITY ), WHICH OPERATES AS A CEMENT MANUFACTURING PLANT. THIS FACILITY HAS NOT PRODUCED CEMENT SINCE 1988, HOWEVER A PORTION OF THE PLANT IS USED AS A CEMENT DISTRIBUTION TERMINAL, WHERE BULK CEMENT IS BROUGH IN BY RAIL AND DISBURSED BY TRUCK. DURING JUNE 1989 THROUGH NOVEMBER, 1989, LAFARGE CONDUCTED A DEMOLITON AND SALVAGING OPERATION AT THE FACILITY WHICH INVOLVED THE DISMANTLING OF BUILDINGS AND THE REMOVAL OF TRANSITE ROOF- ING AND SIDING. DURING THIS TIME, LAFARGE CONTRACTED WITH INDUSTRIAL METALS, A COMPANY BASED IN DALLAS, TX, TO SALVAGE METAL EQUIPMENT FROM THE FACILITY.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown