← EPA enforcement cases

GNB INDUSTRIAL BATTERY CO.

Judicial · FY1992 · — · Final Order With Penalty · 35386

$63K
Penalty
Cost recovery
$25K
Compliance action

Case

Case Number
06-1992-0039
Type
Judicial
Lead
EPA
Outcome
Final Order With Penalty
DOJ Docket
90-5-1-1706
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

01/02/92 SYNOPSIS: GNB INDUSTRIAL BATTERY CO., INC. (GNB) OWNS AND OPERATES A LEAD-ACID BATTERY MANUFACTURING PLANT IN FORT SMITH, ARK. THIS FACILITY IS A BRANCH OF GNB INDUSTRIAL BATTERY CO., INC. IN LOMBARD, ILL. WHICH IS A SUBSIDIARY OF GNB, INC. OF ST. PAUL, MN. GNB HAS INSTALLED NEW EQUIPMENET SINCE JANUARY 14, 1980 WHICH IS THE APPLICABILITY DATE FOR THE STANDARDS OF PERFORMANCE FOR LEAD-ACID BATTERY MANUFACTURING PLANTS, 40 C.F.R. 60, SUBPART KK. THE FACILITY IS SUBJECT TO NSPS SUBPARTS A AND KK. THE NSPS REGULATIONS REQUIRED GNB TO NOTIFY EPA OF A PHYSICAL OR OPERATIONAL CHANGE TO AN EXISTING FACILITY WHICH MAY INCREASE THE EMISSION RATE OF ANY AIR POLLUTANT TO WHICH A STANDARD APPLIES. SUCH NOTIFICATION WAS REQUIRED TO BE POSTMARKED 60 DAYS OR AS SOON AS PRACTICABLE BEFORE THE CHANGE IS COMMENCED. THE NSPS REGULATIONS ALSO REQUIRED GNB TO CONDUCT PERFORMANCE TESTS ON AFFECTED FACILITIES CONSTRUCTED AFTER JANUARY 14, 1980. GNB FAILED TO TIMELY CONDECT SUCH PERFORMANCE TESTS, AND FAILED TO INSTALL MONITORING EQUIPMENET REQUIRED TO BE IN PLACE PRIOR TO CONDUCTING SUCH TESTS. GNB FURTHER FAILED TO TIMELY NOTIFY EPA PRIOR TO VISIBLE EMISSION READINGS AND PRIOR TO PERFORMANCE TESTS. WHEN PERFORMANCE TESTS WERE FINALLY CONDUCTED, LAB ANALYSIS WAS NOT CORREC

Source

Authoritative
EPA ECHO