# TOTAL PETROLEUM, INC.
> **Judicial** · FY1995 · — · Final Order With Penalty
## Case
- **Activity ID:** `35889`
- **Case Number:** 06-1995-0012
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $75K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- TOTAL PETROLEUM, INC. (complaint) (settlement)
## Summary

1. SECTION 111 AND 113 OF THE CLEAN AIR ACT ( CAA ), 42 U.S.    C. SECS. 7411 AND 7413, 40 C.F.R. PART 60, SUBPARTS A, J,    KA, VV, GGG, AND QQQ, NEW SOURCE PERFORMANCE STANDARDS       ( NSPS ).                                                 2. TOTAL PETROLEUM, INC.                                        BY PASS 142                                                  P.O. BOX 188                                                 ARDMORE, OKLAHOMA 73402-0188                                 AGENT FOR SERVICE:                                           DANIEL L. VALOT                                              PRESIDENT AND CEO                                            TOTAL PETROLEUM, INC.                                        900 19TH STREET                                              SUITE 2201                                                   DENVER, COLORADO 80202                                    3. TOTAL WAS IN VIOLATION OF THE REGULATIONS OF THE CAA BY      FAILING TO INITIALLY PERFORMANCE TEST HEATER H-1018 (A       FUEL GAS COMBUSTION DEVICE), FAILING TO MAINTAIN SECOND-     ARY SEAL ON TANK #84 (SOUR CRUDE OIL TANK, WITHOUT HOLES,    TEARS OR OTHER OPENINGS), FAILING TO MONITOR LEAKING VAL-    VES MONTHLY UNTIL A LEAK IS NOT DETECTED FOR 2 CONSECU-      TIVE MONTHS, INCOMPLETE EQUIPMENT LOGS ON 3/10-11/93 FOR     DIFFICULT-TO-MONITOR VALVES, INCOMPLETE SEMI-ANNUAL RE-      PORTS FOR 1991, 1992, AND 1993, FAILING TO INITIALLY PER-    FORMANCE TEST THE CRUDE UNIT FLAR

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*