# CENTRAL MAINTENANCE FACILITY
> **Administrative - Formal** · FY2015 · — · Final Order With Penalty
## Case
- **Activity ID:** `3600019481`
- **Case Number:** 07-2015-0024
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- CENTRAL MAINTENANCE FACILITY (complaint) (settlement)
## Summary

AT THE TIME OF INSPECTION, THE FACILITY FAILED TO ENSURE PROPER OPERATION OF THEIR CATHODIC PROTECTION SYSTEM FOR TWO OF THEIR TANKS (U010 & U011); FAILED TO PROVIDE AN ADEQUATE RELEASE DETECTION FOR THREE OF THEIR TANKS (U013, U 014 & U 015); AND FAILED TO MAINTAIN RELEASE DETECTION MONITORING ON TOW OF THEIR TANKS (U010 & U011).

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*