# SCHERRER ENGINEERING AND CONSTRUCTION, INC.
> **Administrative - Formal** · FY2015 · — · Final Order With Penalty
## Case
- **Activity ID:** `3600051822`
- **Case Number:** 03-2015-0039
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- SCHERRER ENGINEERING AND CONSTRUCTION, INC. (SB) (complaint) (settlement)
## Summary

EPA REGION III FILED A CONSENT AGREEMENT AND FINAL ORDER SIMULTANEOUSLY COMMENCING AND CONCLUDING AN ADMINISTRATIVE ACTION PROCEEDING AGAINST SCHERRER ENGINEERING AND CONSTRUCTION, INC. FOR SIX (6) ALLEGED VIOLATIONS OF THE RRP RULE AT SINGLE RENOVATION LOCATED IN WHEELING, WEST VIRGINIA INCLUDING.   THE ALLEGED VIOLATIONS INCLUDED:   FAILING TO PROVIDE THE OWNER WITH A EPA-APPROVED LEAD HAZARD PAMPHLET, FAILING TO OBTAIN AN INITIAL FORM CERTIFICATION, FAILING TO ENSURE A CERTIFIED RENOVATOR WAS ASSIGNED, FAILING TO POST WARNING SIGNS, FAILING TO CONTAIN WASTE, AND FAILING TO RETAIN RECORDS DEMONSTRATING COMPLIANCE WITH WORK PRACTICES.   PER THE TERMS OF THE CAFO, RESPONDENT WILL PAY A CIVIL PENALTY IN THE AMOUNT OF $22,500 WITH INTEREST OVER AN 18 MONTH PERIOD.

---