SARALAND, LLLP/MIDDLE GEORGIA ROAD BUILDERS AND DEVELOPERS, INC./ROBERT SUTTON

Administrative - Formal · FY2014 · — · Final Order No Penalty · 3600115410

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2014-5765
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
Self-disclosure
N

Defendants (3)

Summary

2/11/15 - ADMINISTRATIVE COMPLIANCE ORDER ON CONSENT ISSUED. THIS AOC PERTAINS TO THE DEPOSITION OF DREDGED AND/OR FILL MATERIAL DURING THE CONSTRUCTION OF A RECREATIONAL LAKE APPROX 200 ACRES IN SIZE. THE DISCHARGES INTO JURISDICTIONAL WETLANDS AND WTER OF THE U.S. IMPOUNDED APPROX 3 MILES OF UNNAMED TRIBUTARIES AND 94 ACRES OF WETLANDS THAT ARE ADJACENT TO THE UNMANED TRIBUTARIES ON PROPERTY OWNED BY SARALAND, LLLP. SINCE THE LAKE HAS BEEN DRAINED, THE IMPACTS HAVE BEEN REDUCED TO THE FILL IN THE DAM FOOTPRINT AND IMPACTS TO SEVERAL HUNDRED FEET OF THE TRIBUTARIES AND THE WETLANDS ADJACENT TO THESE TRIBUTARIES. THESE TRIBUTARIES FLOW INTO GUM SWAMP CREEK, WHICH IS IMPOUNDED TO FORM LITTLE OCMULGEE LAKE, A NAVIGABLE-IN-FACT WATER OF THE U.S IN THE STATE OF GA. SARALAND, LLLP WAS THE OWNDER AND OPERATOR OF THE TRACT OF LAND THAT CONTAINED THE DISCHARGE AREA. LISTER HARRELL WAS THE PRESIDENT AND MAJORITY OWNDER OF SARALAND, LLLP. THE RESPONDENTS )MR. ROBERT SUTTON, SARALAND, LLLP, AND MIDDLE GEORGIA ROAD BUILDERS AND DEELPOERS, INC. (MGRB)) AND LISTER HARRELL DIRECTED, SUPERVISED, AND/OR CARRIED OUT THE EARTHMOVING ACTIVITIES THAT RESULTED IN THE DISCHARGES AT THE SITE. ROBERT SUTTON AND MGRB WERE OPERATORS ON THE SITE DURING THIS TIME PERIOD. COMMENCING ON OR AOBUT MAY 2007, RESPONDENTS AND/OR THOSE ACTING ON BEHALF OF THE RESPONDENTS DISCHARGED DREDGED AND/OR FILL MATERIAL INTO TRIBUTARIES AND WETALNDS ON THE SITE USING EARTH MOVING MACHINERY DURING UNAUTHORIZED A

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown