# LOWE, GLENN EDWARD
> **Administrative - Formal** · FY2015 · — · Final Order No Penalty
## Case
- **Activity ID:** `3600129970`
- **Case Number:** 04-2015-5752
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- LOWE, GLENN EDWARD (settlement)
## Summary

4/14/15 - ADMINISTRATIVE COMPLIANCE ORDER ON CONSENT ISSUED.  THE AOC PERTAINS TO THE DEPOSITION OF DREDGED AND/OR FILL MATERIAL INTO JURISDICTINAL WETLANDS AND WATERS OF THE U.S., INCLUDING 1.5 ACRES OF WETLANDS AND 750 LINEAR FEET OF STREAM CHANNEL WITHIN DRY BRANCH, A TRIBUTARY OF THE YELLOW RIVER, A NAVIGABLE WATER OF THE U.S., DURING ACTIVITIES ASSOCITAED WITH CONSTRUCTION OF AN IN-STREAM IMPOUNDMENT. THE SITE IS LOCATED WEST OF OLD RIVER ROAD IN BAKER, FL. 

COMMENCING ON OR ABOUT AUG 2010 TO PRESENT, RESPONDENT AND/OR THOSE ACTING ON BEHALF OF THE RESPONDENT, DISCHARGED DREDGED AND/OR FILL MATERIAL INTO WETLANDS ON THE SITE USING EARTH MOVING MACHINERY DURING CONSTRUCTION OF AN IN-STREAM IMPOUNDMENT. TO DATE, THE UNAUTHORIZED DREDGED AND/OR FILL MATERIAL REMAINS IN WATERS OF THE U.S.

EPA ISSUED AN ADMIN COMPLIANCE ORDER ON MARCH 4, 2011, REQUIRING THE RESPONDENT TO PRESENT A SITE RESTORATION PLAN THAT WOULD REMOVE THE IN-STREAM IMPOUNDMENT AND RESTORE THE WETLANDS AND STREAM TO PRE-IMPACT CONDITIONS. A RESPONSE WAS RECEIVED ON MAY 24, 2012, PROPOSING TO PERMIT THE POND AFTER-THE-FACT AND MITIAGATING FOR THE IMPACTS. ON NOV 19, 2014, EPA AND RESPONDENT AGREED THAT THE RESPONDENT WOULD PURSUE AN ATF PERMIT FOR THE IN-STREAM IMPOUNDMENT AND MITIGATE THE IMPACTS BY PURCHASING WETLAND CREDITS FORM AN APPROVED MITIGATION BANK.  

AT NO TIME DURING THE DISCHARGE OR DREDGED AND/OR FILL MATERIAL INTO THE DISCHARGE AREA DID RESPONDENT POSSESS A PERMIT UNDER CWA 404.

AG

---