# CLARK CONSTRUCTION GROUP, LLC (ST. ELIZABETHS WEST CAMPUS PHASE 1 HQ)
> **Administrative - Formal** · FY2015 · — · Final Order With Penalty
## Case
- **Activity ID:** `3600153272`
- **Case Number:** 03-2015-0103
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- CLARK CONSTRUCTION GROUP, LLC (complaint) (settlement)
## Summary

DISCHARGING STORMWATER AND GROUND WATER DIRECTLY TO THE OUTLET STRUCTURE OF THE SEDIMENT BASIN AND THEN TO THE DISTRICT OF COLUMBIA MUNICIPAL SEPARATE STORM SEWER SYSTEM.  FAILING TO MAINTAIN EROSION AND SEDIMENT AND/OR SOIL FROM CONTACT WITH STORMWATER. FAILING TO POST NOTICE OF PERMIT COVERAGE CONSPICUOUSLY AT A SAFE, PUBLICLY ACCESSSIBLE LOCATION.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*