Mack Studios Inc. (SB) et al.

Administrative - Formal · FY2015 · — · Final Order With Penalty · 3600188850

Penalty
Cost recovery
Compliance action

Case

Case Number
02-2015-3404
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (2)

Summary

The Respondents own and operated the construction site located southwest of the intersection of Allen Street and Technology Park Boulevard in the City of Auburn, New York, where construction activities took place between December 2013 and October 2014. EPA inspected the site on May 16, 2014 and identified that the site failed to comply with the terms and conditions of its NYSDEC SPDES Construction General Permit by, among other things, failing to implement and maintain the SWPPP, failing to conduct and document weekly inspections once every seven (7) calendar days, failing to maintain records on-site, and failing to implement corrective actions subsequent to SWPPP inspection notifications. Stormwater discharges from the Site drain to a wetland hydraulically connected to the Owasco Outlet, which flows to the Seneca River. A turbid stormwater discharge from the site to the wetland was observed and documented by EPA at the time of the CEI.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown