# DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DISTRICT OF COLUMBIA WASA)
> **Administrative - Formal** · FY2015 · — · Final Order With Penalty
## Case
- **Activity ID:** `3600391551`
- **Case Number:** 03-2015-0197
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (complaint) (settlement)
## Summary

EPA REACHED A $12,000 SETTLEMENT WITH THE DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY.  EPA ALLEGED THAT DC WATER AND SEWER AUTHORITY FAILED TO MAINTAIN APPROPRIATE CONCRETE WASHOUT AND STOCKPILE MAINTENANCE PROCEDURES IN VIOLATION OF ITS NPDES PERMIT.  THESE ALLEGED VIOLATIONS WERE DISCOVERED DURING AN INSPECTION OF THE DC WATER AND SEWER AUTHORITY'S CSO 19 CONSTRUCTION SITE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*