9/29/15 - ADMINISTRATIVE COMPLIANCE ORDER ON CONSENT ISSUED. THIS AOC PERTAINS TO THE DEPOSITION OF DREDGED AND/OR FILL MATERIAL INTO JURISDICTIONAL WETLANDS AND WATERS OF THE U.S. INCLUDING AN APPROX 460-FOOT BY 20-FOOT WIDE CAUSEWAY CONSTRUCTED IN THE EASTERN END OF DUKE LAKE AND ITS ADJACENT WETLANDS, AN OXBOW LAKE THATIS CONNECTED AT HIGH WATER TO THE BLACK RIVER, NORTHEAST OF HIGHWAY 261, APPROX 5 MILES NORTHWEST OF KINGSTREE, SC.
ON APR 2, 2004, MR. PLAYER TRANSMITTED A LETTER TO THE U.S. ARMY CORPS OF ENGINEERS REQUESTING WRITTEN CONFIRMATION OF A PRIOR DISCUSSION REGARDING CONSTRUCTION OF A ROAD AT HIS DUKE LAKE PROPERTY.
ON SEPT 4, 2006, MR. PLAYER TRANSMITTED A LETTER TO THE CORPS ENCLOSING DOCUMENTS PREVIOUSLY REQUESTED BY THE CORPS.
ON OR ABOUT AUG 17, 2007, THE SC FORESTRY COMMISSION (SCFC) TRANSMITTED A LETTER TO MR. PLAYER ADVISING THAT THE PROPOSED ROAD MEETS THE BMP GUIDELINES FOR THE HARVEST OF TIMBER AND THAT THE CORPS HAD ADVISED SCFC THAT THIS INFO WAS SATISFACTORY TO THE CORPS BUT THAT THE ROAD MAY NEED TO BE RE-EVALUATED AFTER HARVEST.
ON AUG 17, 2007, SCFC TRANSMITTED A LETTER TO THE CORPS ADVISING THAT SCFC DEFINITELY MEETS SILVICULTURAL EXEMPTION GUIDELINES AS A TEMPORARY ROAD.
ON SEPT 14, 2007, THE CORPS TRANSMITTED A LETTER TO MR. PLAYER ADVISING HIM THAT HIS PROPOSED FORESTRY ACCESS ROAD, WITH CROSSINGS THRU WATERS OF THE U.S., TO FACILITATE A SILVICULTURE OPERATION WAS EXEMPT FROM PERMITTING REQUIREMENTS AS LONG AS IT DID N