← EPA enforcement cases

CITY OF BOZEMAN, MONTANA

Administrative - Formal · FY2016 · — · Final Order No Penalty · 3600429968

Penalty
Cost recovery
Compliance action

Case

Case Number
08-2016-0002
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

EPA NPDES inspectors conducted a pretreatment compliance inspection (PCI) at the Bozeman Wastewater Treatment Plant on September 8-9, 2014. Several deficiencies and associated corrective actions were noted. Among those deficiencies were the recurring failures to implement the City?s approved pretreatment program, summarized below. Many of these findings have been identified in previous PCIs and pretreatment audits as well as other communications with the City. Failure to Identify and Locate All Possible IUs Subject to Pretreatment Program and to Characterize IUs? Waste Failure to Prepare, Maintain, and Submit a List of SIUs Inadequate Legal Authority Failure to Update Local Limits Failure to Enforce Local Limits Failure to Control SIUs Through Permit, Order, or Similar Means Failure to Operate Consistent with Respondent?s Legal Authority Failure to Include All Required Elements in SIU Permits Failure to Evaluate SIUs for the Need to Develop a Slug Plan or Other Slug Controls Failure to Conduct Inspections with Sufficient Care to Produce Admissible Evidence Failure to Sample SIUs at Least Annually Failure to Conduct Sampling and Analyses Using Required Methods and Techniques Failure to Create and Maintain Records Failure to Enforce According to the Respondent?s Enforcement Response Plan Failure to Develop and Implement Accurate SNC Procedure Failure to Have Adequate Resources to Implement the Pretreatment Program The Order requires the City to take several

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown