# JOHN MANEELY COMPANY D/B/A WHEATLAND TUBE DIVISION
> **Administrative - Formal** · FY2016 · — · Final Order With Penalty
## Case
- **Activity ID:** `3600487218`
- **Case Number:** 03-2016-0030
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- JMC STEEL GROUP, INC, WHEATLAND TUBE DIVISION (complaint) (settlement)
## Summary

JMC STEEL GROUP, INC. WHEATLAND TUBE DIVISION, AT ITS TUBULAR STEEL MANUFACTURING FACILITY LOCATED IN WHEATLAND, PENNSYLVANIA, EXCEEDED ITS PERMITTED OPACITY LIMIT ON A NUMBER OF OCCASIONS IN 2014 AND 2014 AND FAILED TO MAINTAIN THE PROPER PRESSURE DROP FOR ITS FABRIC COLLECTOR ON A NUMBER OF OCCASIONS OF 2013 AND 2014.  THE COMPANY SELF-REPORTED THESE VIOLATIONS IN ITS REQUIRED PERMJIT COMPLIANCE CERTIFICATION.

---