THIS AOC IMPLEMENTS THE REMEDY SELECTED IN THE STATEMENT OF BASIS. AN ASPHALT COVER, INSTITUTIONAL CONTROLS (AN ENVIRONMENTAL COVENANT), PERIODIC OPERATION OF THE REMEDIATION WELL SYSTEM, AND SAMPLING TO ASSURE THERE ARE NO VFAPOR INTRUSION ISSUES IN THE ON-SITE BUILDING. THE REMEDY FOR GROUNDWATER INCLUDES A SOIL-BENTONITE CONTAINMENT WALL, A REMEDIATION WELL, REMOVAL OF DNAPL FROM BELOW THE WATER TABLE WHEN POSSIBLE, AND THE ENVIRONMENTAL COVENANT TO RESTRICT GROUNDWATER USE.