# DART CONTAINER COMPANY
> **Administrative - Formal** · FY2016 · — · Final Order With Penalty
## Case
- **Activity ID:** `3600730826`
- **Case Number:** 04-2016-8000
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- DART CONTAINER COMPANY (complaint) (settlement)
## Summary

5/24/16 - EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $6,700.  RESPONDENT SHALL MAKE PAYMENT FIFTEEN DAYS.

ALLEGED VIOLATIONS:
ON NOVEMBER 19, 2014, EPA ALLEGES THAT THE RESPONDENT VIOLATED THE ACT'S CHEMICAL ACCIDENT PREVENTION PROVISIONS, WHEN AT THE TIME OF INSPECTION, RESPONDENT DID NOT PROVIDE EVIDENCE THAT:

ITS WORST CASE RELEASE QUANTITY WAS THE GREATEST AMOUNT HELD IN A SINGLE VESSEL AS REQUIRED BY 40 CFR SECTION 68.65(b)(1);

IT DOCUMENTED THAT EQUIPMENT COMPLIES WITH RECOGNIZED AND GENERALLY ACCEPTED GOOD ENGINEERING PRACTICES AS REQUIRED BY 40 CFR SECTION 68.65(d)(2);

IT ESTABLISHED A SYSTEM TO PROMPTLY ADDRESS THE TEAM'S FINDINGS AND RECOMMENDATIONS; ASSURED THAT RECOMMENDATIONS ARE RESOLVED IN A TIMELY MANNER AND THAT THE RESOLUTION WERE DOCUMENTED WHAT ACTIONS ARE TO BE TAKEN; COMPLETE ACTIONS AS SOON AS POSSIBLE; DEVELOPED A WRITTEN SCHEDULE OF WHEN THESE ACTIONS ARE TO BE COMPLETED AS REQUIRED BY 40 CFR SECTION 68.67(e);

IT CERTIFIED ANNUALLY THAT THE OPERATING PROCEDURES ARE CURRENT AND ACCURATE AS REQUIRED BY 40 CFR SECTION 68.69(e);

IT PREPARED A RECORD WHICH CONTAINS TH IDENTITY OF TH EMPLOYEE, THE DATE OF TRAINING, AND THE MEANS USED TO VERIFY THAT THE EMPLOYEE UNDERSTOOD THE TRAINING AS REQUIRED BY 40 CFR SECTION 68.71(c);

IT ESTABLISHED AND IMPLEMENTED WRITTEN PROCEDURES TO MANAGE CHANGES THAT ASSURED THE AUTHORIZATION REQUIREMENTS FOR THE PROPOSED CHANGE WERE ADDRESSED PRIOR TO ANY CHANGE AS REQUIRED BY 40 CFR SEC

---