← EPA enforcement cases

BAILEY PORT, INC.

Administrative - Formal · FY2016 · — · Final Order No Penalty · 3600735333

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2016-5761
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

6/1/16 - ADMINISTRATIVE COMPLIANCE ORDER ON CONSENT ISSUED. THIS AOC PERTAINS TO THE DEPOSITION OF DREDGED AND/OR FILL MATERIAL INTO TWO SEPARATE DISCHARGE AREAS AND FOR FAILURE TO MEET PERMIT CONDITIONS THAT REQUIRED ON-SITE ITIGATION AS FOLLOWS: A. DISCHARGE AREA 1 IS A DISCHARGE OF DREDGED AND/OR FILL MATERIAL INTO APPROX 40 LINEAR FEET OF CYPRESS CREEK, A TRIBUTARY OF THE TENNESSEE RIVER, A TRADITIONAL NAVIGABLE WATER OF THE U.S., DURING ACTIVITIES ASSOCIATED WITH THE CONSTRUCTION OF AN UNPERMITTED IN-STREAM ROAD CROSSING. B. DISCHARGE AREA 2 IS A DEPOSITION OF DREDGED AND/OR FILL MATERIAL INTO APPROX 500 LINEAR FEET OF AN UNNAMED TRIBUTARY OF CYPRESS CREEK, A TRIBUTARY OF THE TENNESSEE RIVER, A TRADITIONAL NAVIGABLE WATER OF THE U.S. AND APPROX 1 ACRE OF JURISDICTIONAL WETLANDS DURING ACTIVITIES ASSOCIATED WITH CONSTRUCTION OF AN UNPERMITTED ROCK QUARRY. C. FOR FAILED MITIGATION REQUIREMENTS ASSOCIATED WITH P&L RAILROAD SPUR BRIDGE CONSTRUCTION. COMMENCING ON OR ABOUT JULY 8, 2014, TO PRESENT, RESPONDENTS DISCHARGED DREDGED AND/OR FILL MATERIAL INTO JURISDICTIONAL WATERS DURING THE CONSTRUCTION OF AN UNAUTHORIZED IN-STREAM ROAD CROSSING. TO DATE, THE UNAUTHORIZED DREDGED AND/OR FILL MATERIAL REMAINS IN WATERS OF THE U.S. RESPONDENTS' UNAUTHORIZED ACTIVITIES IMPACTED APPROX 400 LINEAR FEET OF CYPRESS CREEK, A TRIBUTARY OF THE TENNESSEE RIVER, A NAVIGABLE-IN-FACT WATER OF THE U.S. EPA ISSUED A LETTER TO RESPONDENTS ON APR 29, 2014, INSTRUCTING THE RESP

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown