# WESTLAKE LANDFILL SUPERFUND SITE/BRIDGETON LANDFILL
> **Administrative - Formal** · FY2016 · — · Final Order With Unspecified Cost Recovery
## Case
- **Activity ID:** `3600756201`
- **Case Number:** 07-2016-0223
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Unspecified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- WESTLAKE LANDFILL SUPERFUND SITE/BRIDGETON LANDFIL (complaint) (settlement)
## Summary

THIS ASAOC REQUIRES THE INSTALLATION OF A HEAT EXTRACTION SYSTEM IN THE  NECK  PORTION OF THE BRIDGETON LANDFILL, DEVELOPMENT OF AN INERT GAS INJECTION SYSTEM, AND INSTALLATION OF AN ETHYLENE VINYL ALCOHOL COPOLYMER (EVOH) COVER OVER THE NORTH QUARRY PORTION OF THE BRIDGETON LANDFILL.  THE SETTLEMENT ALSO REQUIRES THE INSTALLATION OF TWO SULFUR DIOXIDE (SO2) AIR MONITORS AND INSTALLATION OF ADDITIONAL NORTH QUARRY .

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*