7/19/16 - CONSENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $10,680, DUE WITHIN 30 DAYS.
ALLEGATIONS:
ON 12/10/15, EPA AND FDEP CONDUCTED A COMPLIANCE EVALUATION INSPECTION (CEI) AT RESPONDENT'S FACILITY.
- RESPONDENT FAILED TO MAKE AN ADEQUATE HAZ WASTE DETERMINATION ON HAZ PAINT WASTES MNAGED AT THE FACILITY'S SMALL PARTS PAINT AND BLAST BOOTH.
- RESPONDENT MANAGED HAZ WASTE IN CONTAINERS AT ITS FACILITY FOR GREATER THAN 90 DAYS.
- RESPONDENT MANAGED IGNITABLE CHARACTERISTIC HAZ WASTE (D001) INA 55-GAL CONTAINER IN ITS PANEL LINE BLDG. THE CONTAINER WAS NOT CLOSED WHEN WASTE WAS NOT BEING ADDED OR REMOVED.
- RESPONDENT MANAGED HAZ WASTE IN A 55-GAL CONTAINER IN ITS SURFACE PREP BLDG. THE CONTAINER WAS NOT LABELED WITH THE WORDS HAZ WASTE OR WITH WORDS THAT DESCRIBE THE CONTENTS OF THE CONTAINER.
- DURING A REVIEW OF THE HAZ WASTE CONTINGENCY PLAN, EPA FOUND THAT ONE OF THE FACILITY'S EMERGENCY COORDINATORS DID NOT HAVE A CURRENT LISTING OF HIS PHONE NUMBER AND ADDRESS LISTED.
- RESPONDENT MANAGEMENT SPENT UNIVERSAL WASTE LAMPS W/IN A CONTAINER IN ITS MAINTENANCE BLDG. THE CONTAINER WAS NOT CLOSED AT THE TIME OF THE CEI.
- RESPONDENT MANAGED USED OIL W/IN CONTAINERS IN ITS HAZ AND NON-HAZ MATERIALS STORAGE AREA. THE USED OIL CONTAINERS WERE NOT LABELED WITH THE WORDS USED OIL AT THE TIME OF THE CEI.