## Summary

Complaint against the Defendant alleges that certain of the violations in the Complaint caused or contributed to conditions that, on April 17, 2013, led to a release of regulated flammable substances at Hydro Desulfurizer Unit Two (CHD-2) at the Facility that caused a fire that killed two and injured ten of Defendants contract workers. The Complaint also alleges that CHD-2 was not properly included by Defendant within the scope of its Risk Management Plan (RMP) pursuant to 40 CFR 68.12 and 68.150. Since the time the allegations were raised, Defendant developed and implemented a Site Safety Standard, known as SSS-900, to address many required RMP elements to provide for control of hazards during operations. These safe work practices apply to employees and contract employees.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*