← EPA enforcement cases

WISE ALLOYS, LLC - PRODUCTION PLANT

Administrative - Formal · FY2016 · — · Final Order With Penalty · 3600819223

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2016-2909
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

9/27/16 - CONSENT AGREEMENT AND FINAL ORDER ISSUED, ASSESSING A PENALTY OF $67,400, DUE WITHIN 30 DAYS. ALLEGATIONS: ON OR ABOUT JULY 9, 2014, AN INSPECTION WAS CONDUCTED BY ADEM TO DETERMINE COMPLIANCE WITH THE PCB REGS. ADEM INSPECTORS OBSERVED: A. THE HOT LINE MOTOR ROOM, WHICH CONTAINED 6 PCB TRANSFORMERS BEING STORED, WAS NOT PROPERLY MARKED WITH LARGE PCB MARKS. B. TRANSFORMER ROOM #13 AND #14 IN THE SHEET FINISHING BUILDING, WHICH CONTAINED AN OPERATING PCB TRANSFORMER CONTAINING 600 GALLONS OF PYRANOL, WAS NOT PROPERLY MARKED WITH LARGE PCB MARKS. C. THE ENTRANCE TO THE ROOM AT THE PACKING LINE, CONTAINING A PCB TRANSFORMER CONTAINING 881 GALS OF PCB OIL, WAS NOT MARKED WITH A LARGE PCB MARK; D. THE STORAGE DISPOSAL AREA CONTAINED RAINWATER IN THE SECONDARY CONTAINMENT. E. A TRANSFORMER CONTAINING 1,317 GALS OF PYRANOL LOCATED NEAR STRUCTURAL SUPPORT #12 IN THE HOT LINE MOTOR ROOM WAS OBSERVED TO BE LEAKING.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown