# Occidental Chemical Corporation
> **Administrative - Formal** · FY2016 · — · Final Order With Unspecified Cost Recovery
## Case
- **Activity ID:** `3600825411`
- **Case Number:** 02-2016-2021
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Unspecified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Occidental Chemical Corporation (settlement)
## Summary

The Settlement Agreement and Order of Consent concerns the Respondent's performance, under EPA oversight, of the Remedial Design for Operable Unit 2 of the Diamond Alkali Superfund Site. Operable Unit 2 is the lower 8.3 miles of the Lower Passaic River Study Area. The cost of the Remedial Design is estimated at $165 million and includes capping the lower 8.3 miles of the Lower Passaic River, bank to bank.

---