RESPONDENT FAILED TO COMPLY WITH ALL THE REQUIREMENTS OF THE RENOVATION, REPAIR AND PAINTING (RRP) RULE BY FAILING TO COVER THE FLOOR SURFACE WITH TAPED-DOWN PLASTIC SHEETING BEFORE BEGINNING THE RENOVATION AND FAILING TO CONTAIN WASTE FROM RENOVATION ACTIVITIES TO PREVENT RELEASES OF DUST AND DEBRIS BEFORE WASTE WAS REMOVED FROM THE WORK AREA FOR STORAGE OR DISPOSAL.