# Republic Steel Cold Finished Plant
> **Administrative - Formal** · FY2017 · — · Final Order With Penalty
## Case
- **Activity ID:** `3601124864`
- **Case Number:** 05-2017-9914
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Republic Steel Cold Finished Plant (complaint) (settlement)
## Summary

Key Message: Region 5 files an Expedited Settlement Agreement with Republic Steel of Massillon, Ohio to resolve alleged violations of RCRA. 

-The expedited settlement led to a quick resolution between Region 5 and Republic Steel for issues seen during a 2016 inspection.
-Republic Steel has agreed to institute a new record-keeping and monitoring program to ensure all required documents are maintained on site
-The company has also instituted a new training reminder system to ensure its employees are trained on a timely basis. 

On July 24, 2017, U.S. EPA Region 5 filed an Expedited Settlement Agreement and Final Order (ESA) that concludes an administrative action with the Republic Steel Cold Finished Plant of Massillon, Ohio (RSM). RSM provides a variety of cold finishing processes for steel bar products, including turning, straightening, annealing, blasting and pickling. The ESA alleges that RSM violated the Resource Conservation and Recovery Act (RCRA), as determined during an inspection on August 23, 2016. Specifically, it was found that RSM 1) failed to provide hazardous waste management training to its employees in 2015, 2) failed to determine if a waste generated on its site was a hazardous waste, 3) failed to maintain the final signed copies of its hazardous waste manifests and land disposal restriction forms, and 4) failed to properly label containers that were storing used oil. RSM has agreed to pay a $5,000 civil penalty to resolve this matter, and has demonstr

---